Image Description:
November 20, mayor Link Wenling, Zhejiang Province tunnel cave-day two-door area, workers are stone maze of stone walls to install windows. The stone maze covers an area of more than 700 square meters with a total investment of more than 60 million, a maze of walls, the mosaic will be 210 collected from non-stone windows, very unique, in the vicinity of the maze, there are also many stone with foil. At present, the stone labyrinth has been completed, is expected to be completed in December and opening up to tourists, then, the long days of the Link tunnel will add a stone cultural attractions.